Toolbox

Protection and MV calculators

Transformers, fault levels, CTs, relay curves, earthing and power factor, from a protection engineer.

Guides
Charts

How the protection tools fit together

The tools follow the order of a protection study. The answer from one is the input to the next.

  1. Transformer full-load current gives the rated current on each side, the base for switchgear, cable and relay settings.
  2. Short-circuit current estimates the fault level at the transformer secondary from kVA, impedance and the source level.
  3. Fault current at the cable end shows how cable impedance lowers the fault level along a feeder. The minimum value decides whether the relay still sees the fault.
  4. Cable size with derating checks the cable rating after installation factors.
  5. CT burden checks that the current transformer stays accurate at fault current.
  6. IDMT relay time gives the operating time on the four IEC curves, the starting point for grading. The relay setting checklist walks through the full sequence.
  7. Earth conductor size gives the minimum earth cable for the fault current and clearing time.
  8. Earth rod resistance estimates one driven rod in uniform soil.
  9. The lightning and earthing guide explains the path a strike takes, why bonding matters as much as earth resistance, and what surge protection does.
  10. Power factor correction sizes the capacitor bank for a target power factor.

Tools tagged IEC follow IEC methods, such as the IEC 60255 relay curves and IEC 60364 cable ratings. Each page states its formula, its assumptions and a worked example you can check by hand.

These are estimating tools. They do not replace a coordination study, the relay manufacturer's manual or your utility's requirements, and a measured value always overrides a calculated one.