How the protection tools fit together
The tools follow the order of a protection study. The answer from one is the input to the next.
- Transformer full-load current gives the rated current on each side, the base for switchgear, cable and relay settings.
- Short-circuit current estimates the fault level at the transformer secondary from kVA, impedance and the source level.
- Fault current at the cable end shows how cable impedance lowers the fault level along a feeder. The minimum value decides whether the relay still sees the fault.
- Cable size with derating checks the cable rating after installation factors.
- CT burden checks that the current transformer stays accurate at fault current.
- IDMT relay time gives the operating time on the four IEC curves, the starting point for grading. The relay setting checklist walks through the full sequence.
- Earth conductor size gives the minimum earth cable for the fault current and clearing time.
- Earth rod resistance estimates one driven rod in uniform soil.
- The lightning and earthing guide explains the path a strike takes, why bonding matters as much as earth resistance, and what surge protection does.
- Power factor correction sizes the capacitor bank for a target power factor.
Tools tagged IEC follow IEC methods, such as the IEC 60255 relay curves and IEC 60364 cable ratings. Each page states its formula, its assumptions and a worked example you can check by hand.
These are estimating tools. They do not replace a coordination study, the relay manufacturer's manual or your utility's requirements, and a measured value always overrides a calculated one.